Across 1,635 qualifying US industrial recommendations, the median projected simple payback was 7.877 years. The middle half ran from 5.12 to 11.375 years. Those figures describe the assessed proposals for using solar heat to make electricity, in fiscal years 2005 to 2026.

The scope of the plant change

Read interval demand and production together. Identify whether the changed quantity is energy, peak demand or a fixed charge before assigning a tariff. Use the same billing boundary across the comparison and allow for coincident loads outside the project.

A recommendation you can reproduce

Recommendation KS220801 in US fiscal year 2022 pairs US$602,376 of implementation cost with US$76,472 in estimated annual net savings. Dividing the first figure by the second gives 7.877 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$341,230 and the median annual saving was US$46,591. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for using solar heat to make electricity. Lower quartile 5.12, median 7.877 and upper quartile 11.375 years.
Estimated payback for using solar heat to make electricity. Lower quartile 5.12, median 7.877 and upper quartile 11.375 years. Figure by Industry Applied.

What the records can support

The source lists 1,641 recommendations under assessment code 2.9114. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 1,635 comparable records, 192 carry the implemented flag and 1,030 the non-implemented flag. The remaining 413 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 2000–2014, 129 qualifying records had a median of 8.221 years. For fiscal years 2015–2026, 1,506 qualifying records had a median of 7.857 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

AS043001

2006

2

136800

1.461988e-05

SF054907

2020

343660

67154

5.117491

KS220801

2022

602376

76472

7.877079

CM101301

2022

116226

10211

11.38243

UD082101

2010

300000

4575

65.57377

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 10.503 years. At full forecast savings and a 20% higher installed cost, it would give 9.452 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.