Across 37 qualifying US industrial recommendations, the median projected simple payback was 1.049 years. The middle half ran from 0.4354 to 1.406 years. Those figures describe the assessed proposals for using re-usable filters, in fiscal years 1995 to 2020.

The scope of the plant change

Define the work package in physical terms and identify which meter, production counter or invoice can capture its effect. Record a representative operating cycle before changing the process and retain the underlying unit prices alongside measured quantities.

A recommendation you can reproduce

Recommendation MS006407 in US fiscal year 1996 pairs US$1,440 of implementation cost with US$1,373 in estimated annual net savings. Dividing the first figure by the second gives 1.049 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$1,360 and the median annual saving was US$1,601. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

What the records can support

The source lists 38 recommendations under assessment code 3.7196. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 37 comparable records, 5 carry the implemented flag and 31 the non-implemented flag. The remaining 1 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 32 qualifying records had a median of 1.079 years. For fiscal years 2000–2014, 4 qualifying records had a median of 0.6323 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

BD020409

2002

500

16560

0.03019324

MS014206

1999

697

1601

0.4353529

MS006407

1996

1440

1373

1.048798

MS008806

1997

3036

2160

1.405556

MO020106

1997

5281

1958

2.69714

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.398 years. At full forecast savings and a 20% higher installed cost, it would give 1.259 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.