Across 18 qualifying US industrial recommendations, the median projected simple payback was 1.404 years. The middle half ran from 0.8198 to 2.479 years. Those figures describe the assessed proposals for using only certified motor repair shops, in fiscal years 2015 to 2018.

The scope of the plant change

Read interval demand and production together. Identify whether the changed quantity is energy, peak demand or a fixed charge before assigning a tariff. Use the same billing boundary across the comparison and allow for coincident loads outside the project.

A recommendation you can reproduce

Recommendation UK170515 in US fiscal year 2017 pairs US$2,117 of implementation cost with US$1,601 in estimated annual net savings. Dividing the first figure by the second gives 1.322 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$2,074 and the median annual saving was US$1,608. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for using only certified motor repair shops. Lower quartile 0.8198, median 1.404 and upper quartile 2.479 years.
Estimated payback for using only certified motor repair shops. Lower quartile 0.8198, median 1.404 and upper quartile 2.479 years. Figure by Industry Applied.

What the records can support

The source lists 22 recommendations under assessment code 2.4152. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 18 comparable records, 10 carry the implemented flag and 7 the non-implemented flag. The remaining 1 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

7 of 18 comparable proposals had an estimated payback of one year or less. 18 carried a positive implementation cost. Inspect zero-cost and positive-cost proposals separately when comparing a change in operating practice with a capital project.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

UK180705

2018

378

2941

0.1285277

UK170101

2017

8440

10415

0.8103697

UK170515

2017

2117

1601

1.322299

UK170705

2017

6427

2584

2.487229

UK171504

2018

44454

11102

4.004143

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.763 years. At full forecast savings and a 20% higher installed cost, it would give 1.587 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.