Across 92 qualifying US industrial recommendations, the median projected simple payback was 1.851 years. The middle half ran from 0.213 to 3.143 years. Those figures describe the assessed proposals for using fossil fuel powered generator during peak demand periods, in fiscal years 1988 to 2025.

The scope of the plant change

Read interval demand and production together. Identify whether the changed quantity is energy, peak demand or a fixed charge before assigning a tariff. Use the same billing boundary across the comparison and allow for coincident loads outside the project.

A recommendation you can reproduce

Recommendation AS011505 in US fiscal year 1994 pairs US$7,317 of implementation cost with US$4,051 in estimated annual net savings. Dividing the first figure by the second gives 1.806 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$28,594 and the median annual saving was US$22,522. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for using fossil fuel powered generator during peak demand periods. Lower quartile 0.213, median 1.851 and upper quartile 3.143 years.
Estimated payback for using fossil fuel powered generator during peak demand periods. Lower quartile 0.213, median 1.851 and upper quartile 3.143 years. Figure by Industry Applied.

What the records can support

The source lists 105 recommendations under assessment code 2.3192. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 92 comparable records, 27 carry the implemented flag and 60 the non-implemented flag. The remaining 5 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 30 qualifying records had a median of 2.55 years. For fiscal years 2000–2014, 25 qualifying records had a median of 1.068 years. For fiscal years 2015–2026, 37 qualifying records had a median of 0.6868 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

MI038901

2021

80

48176

0.001660578

IP005803

2016

6819

30281

0.2251907

AR017703

1999

92500

48768

1.896736

IP005109

2015

24900

7963

3.126962

CC002708

2023

782250

27289.98

28.66437

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 2.408 years. At full forecast savings and a 20% higher installed cost, it would give 2.167 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.