Across 9 qualifying US industrial recommendations, the median projected simple payback was 0.9069 years. The middle half ran from 0.1237 to 2.111 years. Those figures describe the assessed proposals for using counter-current rinsing to reduce rinse water volume (gravure), in fiscal years 1995 to 2017.

The scope of the plant change

Place the flow and cost boundary on a process diagram. Measure volume during productive hours and during idle intervals, then reconcile it with discharge or purchase records. Keep any change in product quality, yield or treatment requirements with the cost calculation.

A recommendation you can reproduce

Recommendation UD061304 in US fiscal year 2001 pairs US$5,000 of implementation cost with US$5,513 in estimated annual net savings. Dividing the first figure by the second gives 0.9069 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$3,546 and the median annual saving was US$5,513. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for using counter-current rinsing to reduce rinse water volume (gravure). Lower quartile 0.1237, median 0.9069 and upper quartile 2.111 years.
Estimated payback for using counter-current rinsing to reduce rinse water volume (gravure). Lower quartile 0.1237, median 0.9069 and upper quartile 2.111 years. Figure by Industry Applied.

What the records can support

The source lists 9 recommendations under assessment code 3.1227. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 9 comparable records, 6 carry the implemented flag and 3 the non-implemented flag. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

5 of 9 comparable proposals had an estimated payback of one year or less. 9 carried a positive implementation cost. Inspect zero-cost and positive-cost proposals separately when comparing a change in operating practice with a capital project.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

UD096806

2017

2000

87734

0.02279618

UD093003

2015

300

2426

0.1236603

UD061304

2001

5000

5513

0.9069472

SF005610

1995

3546

1680

2.110714

OK053411

1997

35000

2350

14.89362

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.209 years. At full forecast savings and a 20% higher installed cost, it would give 1.088 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.