Across 918 qualifying US industrial recommendations, the median projected simple payback was 0.5705 years. The middle half ran from 0.1773 to 1.396 years. Those figures describe the assessed proposals for using controls to operate equipment only when needed, in fiscal years 1988 to 2026.

The scope of the plant change

Follow one representative order through the affected operation and record elapsed time, productive time and rejected units separately. Compare like product mixes across shifts and check whether a local speed increase moves the bottleneck to the next station.

A recommendation you can reproduce

Recommendation DL023207 in US fiscal year 2024 pairs US$1,637 of implementation cost with US$2,850 in estimated annual net savings. Dividing the first figure by the second gives 0.5744 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$1,600 and the median annual saving was US$4,295. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for using controls to operate equipment only when needed. Lower quartile 0.1773, median 0.5705 and upper quartile 1.396 years.
Estimated payback for using controls to operate equipment only when needed. Lower quartile 0.1773, median 0.5705 and upper quartile 1.396 years. Figure by Industry Applied.

What the records can support

The source lists 1,063 recommendations under assessment code 2.6231. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 918 comparable records, 318 carry the implemented flag and 529 the non-implemented flag. The remaining 71 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 185 qualifying records had a median of 0.5435 years. For fiscal years 2000–2014, 331 qualifying records had a median of 0.5165 years. For fiscal years 2015–2026, 402 qualifying records had a median of 0.6409 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

UF040008

2007

230

111825

0.002056785

AS001008

1990

1000

5640

0.177305

UD091204

2014

20000

35294

0.5666686

MS015704

2000

1008

722

1.396122

LT836702

2023

400000

2629.14

152.141

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.7658 years. At full forecast savings and a 20% higher installed cost, it would give 0.6893 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.