Across 19 qualifying US industrial recommendations, the median projected simple payback was 0.2178 years. The middle half ran from 0.06844 to 0.457 years. Those figures describe the assessed proposals for using a rag recycle service, in fiscal years 1994 to 1999.

The scope of the plant change

Follow a measured quantity of material from receiving through saleable output to recovery or disposal. Account for moisture, rework and scrap sold separately. Capture both the unit price and the handling time so a reduced disposal bill is not counted twice.

A recommendation you can reproduce

Recommendation TN056109 in US fiscal year 1995 pairs US$713 of implementation cost with US$3,274 in estimated annual net savings. Dividing the first figure by the second gives 0.2178 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$350 and the median annual saving was US$2,250. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for using a rag recycle service. Lower quartile 0.06844, median 0.2178 and upper quartile 0.457 years.
Estimated payback for using a rag recycle service. Lower quartile 0.06844, median 0.2178 and upper quartile 0.457 years. Figure by Industry Applied.

What the records can support

The source lists 48 recommendations under assessment code 3.7131. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 19 comparable records, 8 carry the implemented flag and 9 the non-implemented flag. The remaining 2 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

17 of 19 comparable proposals had an estimated payback of one year or less. 19 carried a positive implementation cost. Inspect zero-cost and positive-cost proposals separately when comparing a change in operating practice with a capital project.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

AM027407

1996

75

5340

0.01404494

AS022409

1998

30

450

0.06666667

TN056109

1995

713

3274

0.2177764

MA037901

1996

1664

2866

0.5806001

AM022506

1994

7900

1440

5.486111

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.2904 years. At full forecast savings and a 20% higher installed cost, it would give 0.2613 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.