Across 10 qualifying US industrial recommendations, the median projected simple payback was 1.471 years. The middle half ran from 0.4153 to 4.07 years. Those figures describe the assessed proposals for treating and reusing equipment cleaning solutions, in fiscal years 1995 to 2024.

The scope of the plant change

Follow a measured quantity of material from receiving through saleable output to recovery or disposal. Account for moisture, rework and scrap sold separately. Capture both the unit price and the handling time so a reduced disposal bill is not counted twice.

A recommendation you can reproduce

Recommendation BD014606 in US fiscal year 1999 pairs US$6,500 of implementation cost with US$4,333 in estimated annual net savings. Dividing the first figure by the second gives 1.5 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$5,875 and the median annual saving was US$5,674. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for treating and reusing equipment cleaning solutions. Lower quartile 0.4153, median 1.471 and upper quartile 4.07 years.
Estimated payback for treating and reusing equipment cleaning solutions. Lower quartile 0.4153, median 1.471 and upper quartile 4.07 years. Figure by Industry Applied.

What the records can support

The source lists 14 recommendations under assessment code 3.5142. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 10 comparable records, 2 carry the implemented flag and 7 the non-implemented flag. The remaining 1 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 6 qualifying records had a median of 1.249 years. For fiscal years 2015–2026, 3 qualifying records had a median of 4.862 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

ME017410

1995

233

1851

0.1258779

IP020402

2024

16790

83128

0.2019777

GT061008

1997

10120

7016

1.442417

CO072902

2016

123200

25340

4.861878

BS009704

2017

5250

751

6.990679

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 2 years. At full forecast savings and a 20% higher installed cost, it would give 1.8 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.