Across 242 qualifying US industrial recommendations, the median projected simple payback was 0.132 years. The middle half ran from 0.03546 to 0.3569 years. Those figures describe the assessed proposals for third-party recovery of wooden pallets, in fiscal years 1995 to 2024.

The scope of the plant change

Count pallets by repairability and dimensions, then record haulage and storage. A recycler may accept only a subset of the stack. Compare the net cost per accepted pallet with the disposal route and any purchase of replacement pallets.

A recommendation you can reproduce

Recommendation BD034112 in US fiscal year 2008 pairs US$601 of implementation cost with US$4,560 in estimated annual net savings. Dividing the first figure by the second gives 0.1318 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$200 and the median annual saving was US$1,912. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for third-party recovery of wooden pallets. Lower quartile 0.03546, median 0.132 and upper quartile 0.3569 years.
Estimated payback for third-party recovery of wooden pallets. Lower quartile 0.03546, median 0.132 and upper quartile 0.3569 years. Figure by Industry Applied.

What the records can support

The source lists 483 recommendations under assessment code 3.5316. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 242 comparable records, 113 carry the implemented flag and 121 the non-implemented flag. The remaining 8 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

AS030805

2001

60

23040

0.002604167

BD022910

2003

72

2032

0.03543307

BD034112

2008

601

4560

0.1317982

BD018408

2001

480

1340

0.358209

SD025208

2000

30000

2240

13.39286

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.1757 years. At full forecast savings and a 20% higher installed cost, it would give 0.1582 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.