Across 21 qualifying US industrial recommendations, the median projected simple payback was 0.3162 years. The middle half ran from 0.1389 to 2.474 years. Those figures describe the assessed proposals for selling combustible waste, in fiscal years 1996 to 2022.

The scope of the plant change

Map the heated product, the hot exhaust and the periods when the process keeps equipment warm between batches. Express fuel use per accepted unit alongside total fuel. A change in product mix or loading can move those measures in opposite directions.

A recommendation you can reproduce

Recommendation AS048603 in US fiscal year 2020 pairs US$39,685 of implementation cost with US$125,510 in estimated annual net savings. Dividing the first figure by the second gives 0.3162 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$5,000 and the median annual saving was US$15,970. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for selling combustible waste. Lower quartile 0.1389, median 0.3162 and upper quartile 2.474 years.
Estimated payback for selling combustible waste. Lower quartile 0.1389, median 0.3162 and upper quartile 2.474 years. Figure by Industry Applied.

What the records can support

The source lists 30 recommendations under assessment code 3.6125. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 21 comparable records, 6 carry the implemented flag and 15 the non-implemented flag. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 6 qualifying records had a median of 0.3077 years. For fiscal years 2000–2014, 8 qualifying records had a median of 1.339 years. For fiscal years 2015–2026, 7 qualifying records had a median of 0.3162 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

AS044704

2017

9

32800

0.0002743902

AM049204

2005

500

3600

0.1388889

AS048603

2020

39685

125510

0.3161899

WM005007

2014

97000

39202

2.474364

DS016408

2000

6250

1588

3.935768

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.4216 years. At full forecast savings and a 20% higher installed cost, it would give 0.3794 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.