Across 9 qualifying US industrial recommendations, the median projected simple payback was 0.3261 years. The middle half ran from 0.1465 to 0.7143 years. Those figures describe the assessed proposals for scheduling use of elevators to conserve energy, in fiscal years 1990 to 2007.

The scope of the plant change

Follow one representative order through the affected operation and record elapsed time, productive time and rejected units separately. Compare like product mixes across shifts and check whether a local speed increase moves the bottleneck to the next station.

A recommendation you can reproduce

Recommendation CO021206 in US fiscal year 1991 pairs US$300 of implementation cost with US$920 in estimated annual net savings. Dividing the first figure by the second gives 0.3261 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$300 and the median annual saving was US$1,365. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for scheduling use of elevators to conserve energy. Lower quartile 0.1465, median 0.3261 and upper quartile 0.7143 years.
Estimated payback for scheduling use of elevators to conserve energy. Lower quartile 0.1465, median 0.3261 and upper quartile 0.7143 years. Figure by Industry Applied.

What the records can support

The source lists 12 recommendations under assessment code 2.6223. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 9 comparable records, 6 carry the implemented flag and 3 the non-implemented flag. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

7 of 9 comparable proposals had an estimated payback of one year or less. 9 carried a positive implementation cost. Inspect zero-cost and positive-cost proposals separately when comparing a change in operating practice with a capital project.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

SD005503

1993

236

4262

0.05537306

KU030404

1990

200

1365

0.1465201

CO021206

1991

300

920

0.326087

CO017203

1990

300

420

0.7142857

GT084108

2007

15000

2640

5.681818

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.4348 years. At full forecast savings and a 20% higher installed cost, it would give 0.3913 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.