Across 66 qualifying US industrial recommendations, the median projected simple payback was 0.774 years. The middle half ran from 0.2161 to 1.65 years. Those figures describe the assessed proposals for resizing charging openings or adding a movable door on equipment, in fiscal years 1982 to 2026.

The scope of the plant change

Define the work package in physical terms and identify which meter, production counter or invoice can capture its effect. Record a representative operating cycle before changing the process and retain the underlying unit prices alongside measured quantities.

A recommendation you can reproduce

Recommendation KU046602 in US fiscal year 1996 pairs US$12,960 of implementation cost with US$16,546 in estimated annual net savings. Dividing the first figure by the second gives 0.7833 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$1,800 and the median annual saving was US$4,424. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for resizing charging openings or adding a movable door on equipment. Lower quartile 0.2161, median 0.774 and upper quartile 1.65 years.
Estimated payback for resizing charging openings or adding a movable door on equipment. Lower quartile 0.2161, median 0.774 and upper quartile 1.65 years. Figure by Industry Applied.

What the records can support

The source lists 74 recommendations under assessment code 2.1122. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 66 comparable records, 19 carry the implemented flag and 42 the non-implemented flag. The remaining 5 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 33 qualifying records had a median of 0.6959 years. For fiscal years 2000–2014, 17 qualifying records had a median of 1.071 years. For fiscal years 2015–2026, 16 qualifying records had a median of 0.968 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

LT007601

1986

100

6000

0.01666667

BD027005

2004

1000

4757

0.2102165

OR077402

2023

17436

22803

0.7646362

SF046206

2015

1000

601

1.663894

MZ002502

2008

1400

222

6.306306

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.044 years. At full forecast savings and a 20% higher installed cost, it would give 0.9399 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.