Across 32 qualifying US industrial recommendations, the median projected simple payback was 1.107 years. The middle half ran from 0.6068 to 3.221 years. Those figures describe the assessed proposals for replacing treated water with well or surface water, in fiscal years 2001 to 2026.

The scope of the plant change

Place the flow and cost boundary on a process diagram. Measure volume during productive hours and during idle intervals, then reconcile it with discharge or purchase records. Keep any change in product quality, yield or treatment requirements with the cost calculation.

A recommendation you can reproduce

Recommendation MI043406 in US fiscal year 2023 pairs US$3,460 of implementation cost with US$3,200 in estimated annual net savings. Dividing the first figure by the second gives 1.081 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$16,750 and the median annual saving was US$14,948. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for replacing treated water with well or surface water. Lower quartile 0.6068, median 1.107 and upper quartile 3.221 years.
Estimated payback for replacing treated water with well or surface water. Lower quartile 0.6068, median 1.107 and upper quartile 3.221 years. Figure by Industry Applied.

What the records can support

The source lists 32 recommendations under assessment code 3.4159. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 32 comparable records, 4 carry the implemented flag and 19 the non-implemented flag. The remaining 9 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 2000–2014, 8 qualifying records had a median of 2.538 years. For fiscal years 2015–2026, 24 qualifying records had a median of 0.9144 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

NC065804

2020

500

92941

0.005379757

CL180605

2018

4700

7271

0.6464035

MI034401

2018

62800

55478

1.13198

SU025609

2007

767215

243880

3.145871

OK076808

2008

152330

12550

12.13785

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.442 years. At full forecast savings and a 20% higher installed cost, it would give 1.298 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.