Across 1,530 qualifying US industrial recommendations, the median projected simple payback was 1.495 years. The middle half ran from 0.7814 to 2.477 years. Those figures describe the assessed proposals for replacing electrically-operated equipment with fossil fuel equipment, in fiscal years 1982 to 2025.

The scope of the plant change

Read interval demand and production together. Identify whether the changed quantity is energy, peak demand or a fixed charge before assigning a tariff. Use the same billing boundary across the comparison and allow for coincident loads outside the project.

A recommendation you can reproduce

Recommendation MI037905 in US fiscal year 2020 pairs US$5,914 of implementation cost with US$3,953 in estimated annual net savings. Dividing the first figure by the second gives 1.496 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$6,804 and the median annual saving was US$5,722. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for replacing electrically-operated equipment with fossil fuel equipment. Lower quartile 0.7814, median 1.495 and upper quartile 2.477 years.
Estimated payback for replacing electrically-operated equipment with fossil fuel equipment. Lower quartile 0.7814, median 1.495 and upper quartile 2.477 years. Figure by Industry Applied.

What the records can support

The source lists 1,622 recommendations under assessment code 2.1311. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 1,530 comparable records, 380 carry the implemented flag and 1,101 the non-implemented flag. The remaining 49 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 1,003 qualifying records had a median of 1.437 years. For fiscal years 2000–2014, 389 qualifying records had a median of 1.511 years. For fiscal years 2015–2026, 138 qualifying records had a median of 1.817 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

MA025503

1992

3

5783

0.0005187619

UM024601

2004

26630

34080

0.7813967

KU024501

1988

50000

33489

1.493028

SF018602

2000

1100

444

2.477477

ME014601

1995

70000

377

185.6764

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.995 years. At full forecast savings and a 20% higher installed cost, it would give 1.795 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.