Across 21 qualifying US industrial recommendations, the median projected simple payback was 2.287 years. The middle half ran from 1.676 to 3.173 years. Those figures describe the assessed proposals for replacing electric motors with back pressure steam turbines and using exhaust steam for process heat, in fiscal years 1985 to 2019.

The scope of the plant change

Log steam demand against finished output and record condensate return conditions. Distinguish planned start-up heating from continuous duty and align the baseline with boiler loading. A process change may shift costs between fuel, make-up water and treatment.

A recommendation you can reproduce

Recommendation TN053001 in US fiscal year 1994 pairs US$494,000 of implementation cost with US$216,000 in estimated annual net savings. Dividing the first figure by the second gives 2.287 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$60,000 and the median annual saving was US$30,719. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for replacing electric motors with back pressure steam turbines and using exhaust steam for process heat. Lower quartile 1.676, median 2.287 and upper quartile 3.173 years.
Estimated payback for replacing electric motors with back pressure steam turbines and using exhaust steam for process heat. Lower quartile 1.676, median 2.287 and upper quartile 3.173 years. Figure by Industry Applied.

What the records can support

The source lists 22 recommendations under assessment code 2.3411. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 21 comparable records, 3 carry the implemented flag and 16 the non-implemented flag. The remaining 2 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 6 qualifying records had a median of 1.724 years. For fiscal years 2000–2014, 9 qualifying records had a median of 3 years. For fiscal years 2015–2026, 6 qualifying records had a median of 2.853 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

BS009104

2017

3100

24684.88

0.1255829

NC012606

1997

56800

33895

1.675763

TN053001

1994

494000

216000

2.287037

OK015409

1985

13674

4309

3.173358

IC011102

2006

442680

95000

4.659789

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 3.049 years. At full forecast savings and a 20% higher installed cost, it would give 2.744 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.