Industry Applied

Global industry.
Applied in Australia & New Zealand.

How a small inspection lot can distort the monthly reject rate

One bad small lot and one better large lot produce a 3.6% combined reject rate. Giving the two percentages equal weight reports 6% instead.

Industry Applied Editorial Published 2 min read

Different-sized batches of machined parts at an inspection station. AI-generated editorial illustration.
AI-generated editorial illustration by Industry Applied · Industry Applied editorial artwork

For the share of inspected units rejected across several lots, add rejected units and inspected units separately. Averaging lot percentages answers a different question. When lot sizes vary sharply, the difference can be large enough to send an improvement team after the wrong problem.

Rebuild the month from counts

A workshop inspects 100 valve bodies from lot A and rejects 10. It inspects 400 from B and rejects eight. The lot percentages are 10% and 2%. Their simple mean is 6%, while the pooled result is 18/500 = 3.6%. Both lots matter. The smaller lot has the larger rate and also produced more rejected units in this example.

The combined estimate uses 500 inspected units. A simple average of the two lot percentages would give each lot equal weight.
Figure 1. The combined estimate uses 500 inspected units. A simple average of the two lot percentages would give each lot equal weight. Original figure by Industry Applied Editorial. Illustrative data.

Worked data

Inspection lot

Rejected / inspected

Rejected (%)

A

10 / 100

10

B

8 / 400

2

Combined

18 / 500

3.6

Download the figures in this worked example (CSV)

A process chart needs the denominators too

NIST’s proportions-control-chart method uses the subgroup size when calculating the expected sampling variation. If two subgroups share the same underlying process fraction, a sample of 100 normally has a wider range of plausible results than a sample of 400. Copying one pair of horizontal limits onto every subgroup can overstate one signal and understate another.

The 3.6% describes the inspected units. If one lot was inspected fully and another sampled only after a known issue, it is not automatically the defect rate of everything manufactured. Record how each lot was selected, the defect definition and whether a unit can enter inspection more than once. Keep reinspection separate or use a unique-unit identifier. Otherwise the same troublesome item can inflate both the numerator and denominator.

Why an individual small lot can still deserve attention

Suppose the workshop is choosing between two actions. To reduce the number of valve bodies requiring scrap or rework this month, study absolute rejected counts as well as the rates. Lot A contributed ten and B contributed eight. To understand whether a process may have changed, compare like processes, time order and the expected sampling variation. If A and B used different tools or came from different suppliers, combining them into one chart can conceal the most useful distinction.

The inspection fraction also matters when estimating production loss. Imagine 100 items were sampled from an A run of 1,000 while all 400 B items were inspected. The 18 observed rejects are real findings, but dividing 18 by 1,400 is not a sound estimate of overall production quality. An estimate reflecting the sample design would require assumptions about how the A sample was selected and how representative it was. If A was a targeted audit after complaints, even a weighted extrapolation needs qualification.

Retain each lot’s produced, sampled and rejected counts. An engineer can then compute the inspected-unit rate, an equal-lot comparison or a design-based production estimate as appropriate. Only the first is obtained directly from the two rows in this article.

Sources

NIST/SEMATECH · Proportions control charts

Cover illustration by Industry Applied, generated with AI. Different-sized batches of machined parts at an inspection station.

0 views0 comments

Comments