A shaft measures inside tolerance. Why might inspection still hold it?
A 20 µm guard band changes the acceptance limit for a shaft. A worked decision shows what a hold means and what to agree before the measurement.
A result inside the drawing limit can fall outside an agreed acceptance band once measurement uncertainty is considered. Set the decision rule before measuring the part. Otherwise two parties can read the same certificate and give opposite answers while each uses a different rule.
Draw the upper boundary
Suppose the only limit under discussion is an upper shaft diameter of 10.000 mm. The example agreement sets a guard band of 0.020 mm. Its acceptance limit is therefore 9.980 mm, with equality included. An indication of 9.970 mm is accepted by that rule. A 9.990 mm indication is above the acceptance limit despite still being below the specification limit. The action in this example is to hold it for the specified disposition.

Worked data
Indication | Disposition under example rule | Margin below limit (µm) |
9.970 mm | Accept | 30 |
9.980 mm | Accept at boundary | 20 |
9.990 mm | Hold | 10 |
Download the figures in this worked example (CSV)
Define the meaning of a hold
A hold under this rule does not prove the individual shaft exceeds 10.000 mm. It means the measurement and agreed rule do not support unconditional acceptance. A customer might specify a different rule, an independent remeasurement or a different treatment of conditional results. The wording needs to follow the actual agreement.
ILAC G8 discusses decision rules and statements of conformity. A guard band equal to a stated uncertainty is one possible arrangement. The numerical risk depends on the uncertainty model, distribution and decision rule. Keep the uncertainty basis, units, coverage factor where relevant and the treatment of equality with the inspection record. For a two-sided dimension, document the lower boundary as well.
Replay a customer disagreement before accepting the job
A supplier using simple acceptance sees a 9.990 mm indication against a 10.000 mm upper limit and may describe that result as inside the limit. A customer using the 9.980 mm acceptance boundary places the same result on hold. Sending a more precise copy of the original measurement does not resolve an argument about the decision rule. The purchaser and supplier need the same agreed convention and the same version of the specification.
Consider the cost of a remeasurement. If a more capable measurement method credibly reduces the guard band to 0.005 mm under the parties’ authorised rule, the resulting acceptance boundary becomes 9.995 mm. A new 9.990 mm result could then satisfy that rule. Reusing the old indication while simply writing a smaller uncertainty beside it would be unjustified. The improved uncertainty must belong to the method and measurement actually performed.
Keep the reported value separate from the disposition field in the quality system. Include the rule identifier, acceptance boundary and person or system authorising the disposition. A later engineering concession should appear as a new decision with its own authority. Otherwise the measurement record can be mistaken for evidence that a different rule was applied at the time.
Sources
ILAC · Decision rules and statements of conformity, G8:09/2019
Cover illustration by Industry Applied, generated with AI. Shaft and micrometer at an inspection bench.
A result inside the drawing limit can fall outside an agreed acceptance band once measurement uncertainty is considered. Set the decision rule before measuring the part. Otherwise two parties can read the same certificate and give opposite answers while each uses a different rule.
Draw the upper boundary
Suppose the only limit under discussion is an upper shaft diameter of 10.000 mm. The example agreement sets a guard band of 0.020 mm. Its acceptance limit is therefore 9.980 mm, with equality included. An indication of 9.970 mm is accepted by that rule. A 9.990 mm indication is above the acceptance limit despite still being below the specification limit. The action in this example is to hold it for the specified disposition.

Worked data
Indication | Disposition under example rule | Margin below limit (µm) |
9.970 mm | Accept | 30 |
9.980 mm | Accept at boundary | 20 |
9.990 mm | Hold | 10 |
Download the figures in this worked example (CSV)
Define the meaning of a hold
A hold under this rule does not prove the individual shaft exceeds 10.000 mm. It means the measurement and agreed rule do not support unconditional acceptance. A customer might specify a different rule, an independent remeasurement or a different treatment of conditional results. The wording needs to follow the actual agreement.
ILAC G8 discusses decision rules and statements of conformity. A guard band equal to a stated uncertainty is one possible arrangement. The numerical risk depends on the uncertainty model, distribution and decision rule. Keep the uncertainty basis, units, coverage factor where relevant and the treatment of equality with the inspection record. For a two-sided dimension, document the lower boundary as well.
Replay a customer disagreement before accepting the job
A supplier using simple acceptance sees a 9.990 mm indication against a 10.000 mm upper limit and may describe that result as inside the limit. A customer using the 9.980 mm acceptance boundary places the same result on hold. Sending a more precise copy of the original measurement does not resolve an argument about the decision rule. The purchaser and supplier need the same agreed convention and the same version of the specification.
Consider the cost of a remeasurement. If a more capable measurement method credibly reduces the guard band to 0.005 mm under the parties’ authorised rule, the resulting acceptance boundary becomes 9.995 mm. A new 9.990 mm result could then satisfy that rule. Reusing the old indication while simply writing a smaller uncertainty beside it would be unjustified. The improved uncertainty must belong to the method and measurement actually performed.
Keep the reported value separate from the disposition field in the quality system. Include the rule identifier, acceptance boundary and person or system authorising the disposition. A later engineering concession should appear as a new decision with its own authority. Otherwise the measurement record can be mistaken for evidence that a different rule was applied at the time.
Sources