Six blemishes do not necessarily mean six rejected panels

Separate the count of defects from the count of affected products. Two runs with the same blemish density can need very different rework capacity.

Industry Applied Editorial Published 2 min read

Surface blemishes on components under inspection. AI-generated editorial illustration.
AI-generated editorial illustration by Industry Applied · Industry Applied editorial artwork

A defect count and a defective-unit count describe different workloads. Three blemishes on one enclosure may need three touch-ups but only one trip to the rework bench. If the reporting system regards every blemish as another affected enclosure, the planner can predict a queue that does not exist.

Keep the identity of the panel

Suppose inspectors examine 50 same-size panels in each of two runs. In run A, six blemishes are distributed one each across six panels. In run B, the same six blemishes are concentrated on two panels. Both have 0.12 blemishes per panel. The proportion of panels affected is 12% for A and 4% for B. Whether any panel must actually be rejected depends on the acceptance criteria and disposition.

Both runs have six blemishes across 50 panels. Their distribution determines how many panels need individual attention.
Figure 1. Both runs have six blemishes across 50 panels. Their distribution determines how many panels need individual attention. Original figure by Industry Applied Editorial. Illustrative data.

Worked data

Run

Pattern of blemishes

Panels with at least one (%)

A

Six panels × one

12

B

Two panels × three

4

Download the figures in this worked example (CSV)

Match the metric to the decision

For investigation of a surface process, chart imperfections per comparable unit of inspection. When part sizes differ, assess whether area is a better exposure than number of panels. For rework handling and customer-facing defect reporting, count the distinct units affected. NIST’s u-chart and proportions-chart guidance explain the distinction.

In the inspection record, assign each finding a panel ID and defect class. A later query can then produce either measure. If a scratch crosses two inspection zones, record the agreed counting convention. A change in zone boundaries that creates two defects from one scratch can move a dashboard without any change to the production process.

Sources

NIST · U control chart for defects per unit

NIST/SEMATECH · Proportions control charts