Across 129 qualifying US industrial recommendations, the median projected simple payback was 0.3165 years. The middle half ran from 0.1163 to 1.064 years. Those figures describe the assessed proposals for reducing scrap production, in fiscal years 1983 to 2025.

The scope of the plant change

Connect equipment input power to the service delivered. Log entering and leaving conditions plus run status and schedule. Compare matching load or weather bands, since a cooler week can mimic an improvement even when the equipment behaves identically.

A recommendation you can reproduce

Recommendation AS039704 in US fiscal year 2005 pairs US$150 of implementation cost with US$474 in estimated annual net savings. Dividing the first figure by the second gives 0.3165 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$10,040 and the median annual saving was US$29,091. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

What the records can support

The source lists 160 recommendations under assessment code 3.1192. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 129 comparable records, 64 carry the implemented flag and 59 the non-implemented flag. The remaining 6 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 80 qualifying records had a median of 0.316 years. For fiscal years 2000–2014, 38 qualifying records had a median of 0.2759 years. For fiscal years 2015–2026, 11 qualifying records had a median of 0.8085 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

AM021702

1994

20

11688

0.001711157

TN062402

1998

103200

887305

0.1163072

AS039704

2005

150

474

0.3164557

OR053703

2008

140000

131635

1.063547

HO023025

2000

5000

600

8.333333

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.4219 years. At full forecast savings and a 20% higher installed cost, it would give 0.3797 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.