Across 31 qualifying US industrial recommendations, the median projected simple payback was 0.604 years. The middle half ran from 0.1962 to 1.265 years. Those figures describe the assessed proposals for providing proper maintenance of motor driven equipment, in fiscal years 1994 to 2026.

The scope of the plant change

Read interval demand and production together. Identify whether the changed quantity is energy, peak demand or a fixed charge before assigning a tariff. Use the same billing boundary across the comparison and allow for coincident loads outside the project.

A recommendation you can reproduce

Recommendation LL026909 in US fiscal year 2007 pairs US$720 of implementation cost with US$1,192 in estimated annual net savings. Dividing the first figure by the second gives 0.604 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$5,000 and the median annual saving was US$4,668. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for providing proper maintenance of motor driven equipment. Lower quartile 0.1962, median 0.604 and upper quartile 1.265 years.
Estimated payback for providing proper maintenance of motor driven equipment. Lower quartile 0.1962, median 0.604 and upper quartile 1.265 years. Figure by Industry Applied.

What the records can support

The source lists 37 recommendations under assessment code 2.4313. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 31 comparable records, 15 carry the implemented flag and 14 the non-implemented flag. The remaining 2 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 2000–2014, 8 qualifying records had a median of 0.4419 years. For fiscal years 2015–2026, 21 qualifying records had a median of 0.81 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

TT020602

2018

25

6182

0.004043999

MO021212

1997

800

4018

0.199104

LL026909

2007

720

1192

0.6040268

OR080102

2024

50000

42000

1.190476

WV053607

2016

4320

735

5.877551

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.8054 years. At full forecast savings and a 20% higher installed cost, it would give 0.7248 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.