Across 6 qualifying US industrial recommendations, the median projected simple payback was 1.18 years. The middle half ran from 0.7809 to 2.902 years. Those figures describe the assessed proposals for optimising operation of multi-stage vacuum steam jets, in fiscal years 2002 to 2024.

The scope of the plant change

Log steam demand against finished output and record condensate return conditions. Distinguish planned start-up heating from continuous duty and align the baseline with boiler loading. A process change may shift costs between fuel, make-up water and treatment.

A recommendation you can reproduce

Recommendation OR043906 in US fiscal year 2003 pairs US$3,000 of implementation cost with US$3,250 in estimated annual net savings. Dividing the first figure by the second gives 0.9231 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$158,500 and the median annual saving was US$60,518. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for optimising operation of multi-stage vacuum steam jets. Lower quartile 0.7809, median 1.18 and upper quartile 2.902 years.
Estimated payback for optimising operation of multi-stage vacuum steam jets. Lower quartile 0.7809, median 1.18 and upper quartile 2.902 years. Figure by Industry Applied.

What the records can support

The source lists 6 recommendations under assessment code 2.2161. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 6 comparable records, 2 carry the implemented flag and 4 the non-implemented flag. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

3 of 6 comparable proposals had an estimated payback of one year or less. 6 carried a positive implementation cost. Inspect zero-cost and positive-cost proposals separately when comparing a change in operating practice with a capital project.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

OK063306

2002

200000

276478

0.7233849

IC031301

2024

7079

9651.32

0.7334748

OR043906

2003

3000

3250

0.9230769

NC053601

2015

300000

88496

3.389984

AM041208

2002

117000

32540

3.595575

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.231 years. At full forecast savings and a 20% higher installed cost, it would give 1.108 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.