The median forecast payback for off-peak industrial battery charging was 0.44635 years across 294 qualifying US factory recommendations. The middle half ran from 0.12835 to 1.4757 years. The median estimated annual saving was US$2,222.5. These figures describe proposals at the time of assessment.
The scope of the plant change
Match charger power profiles to fleet return times and the meter’s demand interval. Preserve the state of charge needed for the next shift. If charging moves into a different peak, the bill may simply change the time of day on which it is set.
A recommendation you can reproduce
Recommendation WI050605 in US fiscal year 2006 pairs US$800 of implementation cost with US$1,795 in estimated annual net savings. Dividing the first figure by the second gives 0.4457 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.
The median implementation cost was US$784 and the median annual saving was US$2,222. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

What the records can support
The source lists 598 recommendations under assessment code 2.3132. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.
Of the 294 comparable records, 111 carry the implemented flag and 150 the non-implemented flag. The remaining 33 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.
Worked data
Recommendation ID | US fiscal year | Implementation cost (USD) | Estimated annual net saving (USD) | Recalculated payback (years) |
|---|---|---|---|---|
DL005401 | 2010 | 50 | 15225 | 0.003284072 |
SF007408 | 1995 | 150 | 1174 | 0.1277683 |
WI050605 | 2006 | 800 | 1795 | 0.4456825 |
SF065103 | 2026 | 4194 | 2835 | 1.479365 |
UU012702 | 2018 | 55000 | 4552.88 | 12.08027 |
Using the evidence in an Australian project
For the worked record, delivering only three quarters of its estimated annual saving would give 0.5942 years. At full forecast savings and a 20% higher installed cost, it would give 0.5348 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.
Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.
What a two-year screening rule would have selected
Among the 294 proposals with a positive implementation cost, 233 (79.252%) had a forecast simple payback of two years or less. The calculation excludes 0 zero-cost records. For a local project with a two-year screening period, divide the quoted installed cost by two to find the minimum annual net saving needed. Use local currency and include the recurring cost of making the change.
Sources and calculation files
The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.

