Across 46 qualifying US industrial recommendations, the median projected simple payback was 0.5483 years. The middle half ran from 0.2453 to 1.2 years. Those figures describe the assessed proposals for moderating cooling tower outlet temperature, in fiscal years 1982 to 2026.

The scope of the plant change

Connect equipment input power to the service delivered. Log entering and leaving conditions plus run status and schedule. Compare matching load or weather bands, since a cooler week can mimic an improvement even when the equipment behaves identically.

A recommendation you can reproduce

Recommendation MA061203 in US fiscal year 2007 pairs US$12,750 of implementation cost with US$23,433 in estimated annual net savings. Dividing the first figure by the second gives 0.5441 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$1,740 and the median annual saving was US$2,654. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for moderating cooling tower outlet temperature. Lower quartile 0.2453, median 0.5483 and upper quartile 1.2 years.
Estimated payback for moderating cooling tower outlet temperature. Lower quartile 0.2453, median 0.5483 and upper quartile 1.2 years. Figure by Industry Applied.

What the records can support

The source lists 55 recommendations under assessment code 2.2611. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 46 comparable records, 17 carry the implemented flag and 24 the non-implemented flag. The remaining 5 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 14 qualifying records had a median of 0.6055 years. For fiscal years 2000–2014, 24 qualifying records had a median of 0.8707 years. For fiscal years 2015–2026, 8 qualifying records had a median of 0.2045 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

UW251301

2025

300

30745

0.009757684

OD013903

1999

20

82

0.2439024

MA061203

2007

12750

23433

0.5441045

TT000101

2007

3500

2856

1.22549

OR035802

1999

12750

2574

4.95338

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.7255 years. At full forecast savings and a 20% higher installed cost, it would give 0.6529 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.