Across 493 qualifying US industrial recommendations, the median projected simple payback was 0.2846 years. The middle half ran from 0.1136 to 0.636 years. Those figures describe the assessed proposals for making a practice of turning off lights when not needed, in fiscal years 1993 to 2026.

The scope of the plant change

Record the circuit load, lighting hours and the actual visual task in the work area. Use separately controlled zones as measurement boundaries. Keep a record of daylight, shift occupancy and any maintenance intervention between the baseline and follow-up periods.

A recommendation you can reproduce

Recommendation AS029602 in US fiscal year 2001 pairs US$210 of implementation cost with US$738 in estimated annual net savings. Dividing the first figure by the second gives 0.2846 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$340 and the median annual saving was US$1,391. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for making a practice of turning off lights when not needed. Lower quartile 0.1136, median 0.2846 and upper quartile 0.636 years.
Estimated payback for making a practice of turning off lights when not needed. Lower quartile 0.1136, median 0.2846 and upper quartile 0.636 years. Figure by Industry Applied.

What the records can support

The source lists 1,140 recommendations under assessment code 2.7124. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 493 comparable records, 306 carry the implemented flag and 166 the non-implemented flag. The remaining 21 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 144 qualifying records had a median of 0.2967 years. For fiscal years 2000–2014, 285 qualifying records had a median of 0.2789 years. For fiscal years 2015–2026, 64 qualifying records had a median of 0.3075 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

IA055204

2016

1

3573

0.0002798769

MS024401

2004

4860

42786

0.1135886

AS029602

2001

210

738

0.2845528

UD045103

1995

4440

6981

0.636012

CO061004

2008

15668

2690

5.824535

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.3794 years. At full forecast savings and a 20% higher installed cost, it would give 0.3415 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.