The median forecast payback for limiting and control secondary combustion air in furnace was 0.26858 years across 24 qualifying US factory recommendations. The middle half ran from 0.11266 to 0.85871 years. The median estimated annual saving was US$7,371. These figures describe proposals at the time of assessment.

The scope of the plant change

Map the heated product, the hot exhaust and the periods when the process keeps equipment warm between batches. Express fuel use per accepted unit alongside total fuel. A change in product mix or loading can move those measures in opposite directions.

A recommendation you can reproduce

Recommendation LE011702 in US fiscal year 2001 pairs US$300 of implementation cost with US$1,140 in estimated annual net savings. Dividing the first figure by the second gives 0.2632 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$3,500 and the median annual saving was US$7,371. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for limiting and control secondary combustion air in furnace. Lower quartile 0.1127, median 0.2686 and upper quartile 0.8587 years.
Estimated payback for limiting and control secondary combustion air in furnace. Lower quartile 0.1127, median 0.2686 and upper quartile 0.8587 years. Figure by Industry Applied.

What the records can support

The source lists 24 recommendations under assessment code 2.1114. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 24 comparable records, 11 carry the implemented flag and 10 the non-implemented flag. The remaining 3 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 5 qualifying records had a median of 0.3656 years. For fiscal years 2000–2014, 15 qualifying records had a median of 0.2632 years. For fiscal years 2015–2026, 4 qualifying records had a median of 0.09614 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

NV016001

2000

370

8107

0.04563957

OK060501

2000

723000

6168500

0.1172084

AR008005

1996

11500

41971

0.2739987

NC023009

2002

3500

4254

0.8227551

NC027901

2004

20000

3220

6.21118

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.3509 years. At full forecast savings and a 20% higher installed cost, it would give 0.3158 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

What a two-year screening rule would have selected

Among the 24 proposals with a positive implementation cost, 23 (95.833%) had a forecast simple payback of two years or less. The calculation excludes 0 zero-cost records. For a local project with a two-year screening period, divide the quoted installed cost by two to find the minimum annual net saving needed. Use local currency and include the recurring cost of making the change.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.