Across 6,070 qualifying US industrial recommendations, the median projected simple payback was 1.02 years. The middle half ran from 0.5001 to 1.933 years. Those figures describe the assessed proposals for lighting occupancy sensors, in fiscal years 1993 to 2026.

The scope of the plant change

A room survey should distinguish time occupied from time illuminated. Log both for an ordinary production week, then mark access routes, process sightlines and periods when stationary workers are present. Those conditions constrain the switching hours that can be saved.

A recommendation you can reproduce

Recommendation LS182204 in US fiscal year 2022 pairs US$50 of implementation cost with US$49 in estimated annual net savings. Dividing the first figure by the second gives 1.02 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$927 and the median annual saving was US$1,050. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for lighting occupancy sensors. Lower quartile 0.5001, median 1.02 and upper quartile 1.933 years.
Estimated payback for lighting occupancy sensors. Lower quartile 0.5001, median 1.02 and upper quartile 1.933 years. Figure by Industry Applied.

What the records can support

The source lists 6,137 recommendations under assessment code 2.7135. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 6,070 comparable records, 2,275 carry the implemented flag and 3,344 the non-implemented flag. The remaining 451 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

IP702101

2024

50

16580

0.003015682

ME013401

1994

150

300

0.5

LS182204

2022

50

49

1.020408

OK058104

1999

1098

568

1.933099

AS038204

2004

128880

736

175.1087

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.361 years. At full forecast savings and a 20% higher installed cost, it would give 1.224 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.