Across 159 qualifying US industrial recommendations, the median projected simple payback was 2.095 years. The middle half ran from 1.188 to 2.834 years. Those figures describe the assessed proposals for keeping lamps and reflectors clean, in fiscal years 1982 to 2016.

The scope of the plant change

Record the circuit load, lighting hours and the actual visual task in the work area. Use separately controlled zones as measurement boundaries. Keep a record of daylight, shift occupancy and any maintenance intervention between the baseline and follow-up periods.

A recommendation you can reproduce

Recommendation TN039504 in US fiscal year 1990 pairs US$5,083 of implementation cost with US$2,426 in estimated annual net savings. Dividing the first figure by the second gives 2.095 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$9,652 and the median annual saving was US$5,076. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for keeping lamps and reflectors clean. Lower quartile 1.188, median 2.095 and upper quartile 2.834 years.
Estimated payback for keeping lamps and reflectors clean. Lower quartile 1.188, median 2.095 and upper quartile 2.834 years. Figure by Industry Applied.

What the records can support

The source lists 186 recommendations under assessment code 2.7123. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 159 comparable records, 75 carry the implemented flag and 84 the non-implemented flag. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 152 qualifying records had a median of 2.121 years. For fiscal years 2000–2014, 5 qualifying records had a median of 0.9988 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

UD003201

1982

5

223

0.02242152

TN039702

1990

4066

3408

1.193075

TN039504

1990

5083

2426

2.095218

TN046401

1992

23381

8302

2.816309

OK037704

1992

1881

327

5.752294

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 2.794 years. At full forecast savings and a 20% higher installed cost, it would give 2.514 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.