Across 15 qualifying US industrial recommendations, the median projected simple payback was 0.09242 years. The middle half ran from 0.06532 to 0.5201 years. Those figures describe the assessed proposals for installing redundant equipment to avoid losses caused by equipment failure and routine maintenance, in fiscal years 1996 to 2023.

The scope of the plant change

Define the work package in physical terms and identify which meter, production counter or invoice can capture its effect. Record a representative operating cycle before changing the process and retain the underlying unit prices alongside measured quantities.

A recommendation you can reproduce

Recommendation BD031107 in US fiscal year 2006 pairs US$610 of implementation cost with US$6,600 in estimated annual net savings. Dividing the first figure by the second gives 0.09242 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$1,075 and the median annual saving was US$16,275. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for installing redundant equipment to avoid losses caused by equipment failure and routine maintenance. Lower quartile 0.06532, median 0.09242 and upper quartile 0.5201 years.
Estimated payback for installing redundant equipment to avoid losses caused by equipment failure and routine maintenance. Lower quartile 0.06532, median 0.09242 and upper quartile 0.5201 years. Figure by Industry Applied.

What the records can support

The source lists 15 recommendations under assessment code 3.2111. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 15 comparable records, 6 carry the implemented flag and 9 the non-implemented flag. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 6 qualifying records had a median of 0.1003 years. For fiscal years 2000–2014, 8 qualifying records had a median of 0.08069 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

SF028210

2004

72

34944

0.00206044

UF025106

2000

3034

44000

0.06895455

BD031107

2006

610

6600

0.09242424

OR033208

1998

7000

16275

0.4301075

SD029610

2002

5800

2019

2.872709

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.1232 years. At full forecast savings and a 20% higher installed cost, it would give 0.1109 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.