Across 127 qualifying US industrial recommendations, the median projected simple payback was 1.222 years. The middle half ran from 0.4551 to 2.249 years. Those figures describe the assessed proposals for installing partitions to reduce size of conditioned space, in fiscal years 1993 to 2026.

The scope of the plant change

Define the work package in physical terms and identify which meter, production counter or invoice can capture its effect. Record a representative operating cycle before changing the process and retain the underlying unit prices alongside measured quantities.

A recommendation you can reproduce

Recommendation MI032602 in US fiscal year 2018 pairs US$28,760 of implementation cost with US$23,527 in estimated annual net savings. Dividing the first figure by the second gives 1.222 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$5,000 and the median annual saving was US$5,181. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for installing partitions to reduce size of conditioned space. Lower quartile 0.4551, median 1.222 and upper quartile 2.249 years.
Estimated payback for installing partitions to reduce size of conditioned space. Lower quartile 0.4551, median 1.222 and upper quartile 2.249 years. Figure by Industry Applied.

What the records can support

The source lists 136 recommendations under assessment code 2.7496. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 127 comparable records, 40 carry the implemented flag and 81 the non-implemented flag. The remaining 6 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 16 qualifying records had a median of 1.065 years. For fiscal years 2000–2014, 70 qualifying records had a median of 0.8936 years. For fiscal years 2015–2026, 41 qualifying records had a median of 1.437 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

LE027903

2008

40

13078

0.003058572

BD010601

1998

7000

14857

0.4711584

MI032602

2018

28760

23527

1.222425

MI036008

2019

3764

1675

2.247164

CM105108

2025

3500

402

8.706468

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.63 years. At full forecast savings and a 20% higher installed cost, it would give 1.467 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.