Across 44 qualifying US industrial recommendations, the median projected simple payback was 1.029 years. The middle half ran from 0.5195 to 2.479 years. Those figures describe the assessed proposals for installing desiccant humidity control system, in fiscal years 1992 to 2026.

The scope of the plant change

Follow one representative order through the affected operation and record elapsed time, productive time and rejected units separately. Compare like product mixes across shifts and check whether a local speed increase moves the bottleneck to the next station.

A recommendation you can reproduce

Recommendation UU030106 in US fiscal year 2026 pairs US$86,700 of implementation cost with US$86,700 in estimated annual net savings. Dividing the first figure by the second gives 1 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$42,150 and the median annual saving was US$35,118. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for installing desiccant humidity control system. Lower quartile 0.5195, median 1.029 and upper quartile 2.479 years.
Estimated payback for installing desiccant humidity control system. Lower quartile 0.5195, median 1.029 and upper quartile 2.479 years. Figure by Industry Applied.

What the records can support

The source lists 46 recommendations under assessment code 2.7273. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 44 comparable records, 12 carry the implemented flag and 30 the non-implemented flag. The remaining 2 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 3 qualifying records had a median of 0.8966 years. For fiscal years 2000–2014, 21 qualifying records had a median of 1.058 years. For fiscal years 2015–2026, 20 qualifying records had a median of 1.19 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

TT022601

2019

50000

1033923

0.0483595

MA084902

2023

27882

53317

0.5229477

WI049101

2005

25000

23636

1.057709

OD014901

1999

64698

26618

2.430611

SU059508

2026

4570

786.03

5.814027

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.333 years. At full forecast savings and a 20% higher installed cost, it would give 1.2 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.