Across 674 qualifying US industrial recommendations, the median projected simple payback was 0.2397 years. The middle half ran from 0.03707 to 1.621 years. Those figures describe the assessed proposals for industrial utility tariff changes, in fiscal years 1983 to 2026.

The scope of the plant change

Reprice the same interval history under both tariff schedules. Keep energy, maximum demand, fixed charges and calendar windows separate. A site that changes its production shifts may move to a different result without changing annual consumption.

A recommendation you can reproduce

Recommendation MI026405 in US fiscal year 2014 pairs US$2,100 of implementation cost with US$8,739 in estimated annual net savings. Dividing the first figure by the second gives 0.2403 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$1,595 and the median annual saving was US$12,017. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

What the records can support

The source lists 1,164 recommendations under assessment code 2.8114. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 674 comparable records, 223 carry the implemented flag and 405 the non-implemented flag. The remaining 46 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

SF041806

2012

0.02

11222

1.782214e-06

GT099201

2025

100

2701

0.03702332

GT041701

1990

15000

62710

0.2391963

OK008805

1983

2000

1224

1.633987

SF032203

2006

29800

31

961.2903

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.3204 years. At full forecast savings and a 20% higher installed cost, it would give 0.2884 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.