Across 396 qualifying US industrial recommendations, the median projected simple payback was 2.189 years. The middle half ran from 1.316 to 3.248 years. Those figures describe the assessed proposals for industrial skylights, in fiscal years 1993 to 2025.

The scope of the plant change

Record roof area, working-plane daylight and the lighting controls that can actually reduce input. Include heat gain and any reopening costs for the roof. Daylight has financial value only during the operating periods in which electrical load can be displaced.

A recommendation you can reproduce

Recommendation SD043609 in US fiscal year 2011 pairs US$14,200 of implementation cost with US$6,479 in estimated annual net savings. Dividing the first figure by the second gives 2.192 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$6,062 and the median annual saving was US$3,257. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for industrial skylights. Lower quartile 1.316, median 2.189 and upper quartile 3.248 years.
Estimated payback for industrial skylights. Lower quartile 1.316, median 2.189 and upper quartile 3.248 years. Figure by Industry Applied.

What the records can support

The source lists 410 recommendations under assessment code 2.7145. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 396 comparable records, 85 carry the implemented flag and 298 the non-implemented flag. The remaining 13 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

AM054602

2008

8

22310

0.0003585836

AM031504

1998

2960

2240

1.321429

SD043609

2011

14200

6479

2.191696

SD015202

1996

14692

4543

3.233986

AS036301

2003

22526

552

40.80797

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 2.922 years. At full forecast savings and a 20% higher installed cost, it would give 2.63 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.