Across 715 qualifying US industrial recommendations, the median projected simple payback was 1.559 years. The middle half ran from 0.8708 to 2.672 years. Those figures describe the assessed proposals for industrial radiant spot heating, in fiscal years 1982 to 2026.

The scope of the plant change

Map the occupied work positions and their hours separately from the full volume of the shed. Confirm the comfort requirement and coverage at each workstation. Compare delivered service during both occupied and unoccupied periods.

A recommendation you can reproduce

Recommendation BD022703 in US fiscal year 2003 pairs US$7,000 of implementation cost with US$4,490 in estimated annual net savings. Dividing the first figure by the second gives 1.559 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$10,000 and the median annual saving was US$6,878. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for industrial radiant spot heating. Lower quartile 0.8708, median 1.559 and upper quartile 2.672 years.
Estimated payback for industrial radiant spot heating. Lower quartile 0.8708, median 1.559 and upper quartile 2.672 years. Figure by Industry Applied.

What the records can support

The source lists 726 recommendations under assessment code 2.7231. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 715 comparable records, 172 carry the implemented flag and 520 the non-implemented flag. The remaining 23 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

BD031001

2006

2

4173

0.0004792715

WM012707

2018

2472

2840

0.8704225

BD022703

2003

7000

4490

1.55902

UM001203

1994

6800

2542

2.675059

OK111904

2024

12995

583

22.28988

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 2.079 years. At full forecast savings and a 20% higher installed cost, it would give 1.871 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.