Across 2,774 qualifying US industrial recommendations, the median projected simple payback was 1.646 years. The middle half ran from 1.009 to 2.758 years. Those figures describe the assessed proposals for industrial power-factor correction, in fiscal years 1981 to 2026.

The scope of the plant change

Read the demand charging interval, demand quantity and tariff definition on the actual bill. Log real and apparent power together at that boundary. A reduced current in a feeder does not by itself calculate a monetary saving for the site.

A recommendation you can reproduce

Recommendation MI041504 in US fiscal year 2022 pairs US$7,950 of implementation cost with US$4,830 in estimated annual net savings. Dividing the first figure by the second gives 1.646 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$10,068 and the median annual saving was US$6,271. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

What the records can support

The source lists 2,813 recommendations under assessment code 2.3212. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 2,774 comparable records, 914 carry the implemented flag and 1,686 the non-implemented flag. The remaining 174 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

IP006605

2016

80

13382

0.00597818

OR053404

2008

6825

6768

1.008422

MI041504

2022

7950

4830

1.645963

UD108109

2024

17600

6380

2.758621

TN018601

1983

27000

1180

22.88136

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 2.195 years. At full forecast savings and a 20% higher installed cost, it would give 1.975 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.