Across 5,574 qualifying US industrial recommendations, the median projected simple payback was 1.777 years. The middle half ran from 1.072 to 2.925 years. Those figures describe the assessed proposals for higher-efficiency industrial motors, in fiscal years 1982 to 2026.

The scope of the plant change

Compare shaft duty at the normal load point and hours at each load. If a motor is already due for replacement, record the incremental price as a separate alternative to the full replacement cost. Include any difference in speed that changes the driven load.

A recommendation you can reproduce

Recommendation HO012502 in US fiscal year 1996 pairs US$9,130 of implementation cost with US$5,138 in estimated annual net savings. Dividing the first figure by the second gives 1.777 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$3,224 and the median annual saving was US$1,740. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for higher-efficiency industrial motors. Lower quartile 1.072, median 1.777 and upper quartile 2.925 years.
Estimated payback for higher-efficiency industrial motors. Lower quartile 1.072, median 1.777 and upper quartile 2.925 years. Figure by Industry Applied.

What the records can support

The source lists 5,676 recommendations under assessment code 2.4133. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 5,574 comparable records, 3,334 carry the implemented flag and 1,990 the non-implemented flag. The remaining 250 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

UW003503

2010

1

18058

5.537712e-05

UW002701

2009

10324

9632

1.071844

HO012502

1996

9130

5138

1.776956

UL010902

1994

68870

23541

2.925534

SF031804

2005

8530

3

2843.333

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 2.369 years. At full forecast savings and a 20% higher installed cost, it would give 2.132 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.