Across 1,794 qualifying US industrial recommendations, the median projected simple payback was 0.9537 years. The middle half ran from 0.4094 to 1.909 years. Those figures describe the assessed proposals for high-speed and strip doors, in fiscal years 1981 to 2026.

The scope of the plant change

Count door cycles and open time by shift. Separate vehicle movements from doors left open during idle periods. Compare occupied temperatures and adjacent space conditions across each opening before estimating the avoided heating or refrigeration load.

A recommendation you can reproduce

Recommendation SU055904 in US fiscal year 2024 pairs US$631 of implementation cost with US$662 in estimated annual net savings. Dividing the first figure by the second gives 0.9526 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$1,582 and the median annual saving was US$1,922. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for high-speed and strip doors. Lower quartile 0.4094, median 0.9537 and upper quartile 1.909 years.
Estimated payback for high-speed and strip doors. Lower quartile 0.4094, median 0.9537 and upper quartile 1.909 years. Figure by Industry Applied.

What the records can support

The source lists 1,815 recommendations under assessment code 2.7447. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 1,794 comparable records, 765 carry the implemented flag and 924 the non-implemented flag. The remaining 105 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

UU007404

2004

4

2620

0.001526718

TT000202

2007

8381

20500

0.4088293

SU055904

2024

630.62

661.97

0.9526414

ND034202

2000

10854

5684

1.909571

KU006302

1982

230000

4532

50.75022

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.27 years. At full forecast savings and a 20% higher installed cost, it would give 1.143 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.