Across 324 qualifying US industrial recommendations, the median projected simple payback was 3.118 years. The middle half ran from 1.744 to 5.036 years. Those figures describe the assessed proposals for high-efficiency industrial chiller replacement, in fiscal years 1993 to 2026.

The scope of the plant change

Collect chilled-water load and compressor power in matching intervals. Bin the results by load and condenser condition, then compare the proposed machine across the same bins. Include auxiliaries, reset schedules and the cost of installation access.

A recommendation you can reproduce

Recommendation MZ039207 in US fiscal year 2025 pairs US$62,500 of implementation cost with US$20,181 in estimated annual net savings. Dividing the first figure by the second gives 3.097 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$66,150 and the median annual saving was US$20,154. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for high-efficiency industrial chiller replacement. Lower quartile 1.744, median 3.118 and upper quartile 5.036 years.
Estimated payback for high-efficiency industrial chiller replacement. Lower quartile 1.744, median 3.118 and upper quartile 5.036 years. Figure by Industry Applied.

What the records can support

The source lists 330 recommendations under assessment code 2.2622. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 324 comparable records, 112 carry the implemented flag and 174 the non-implemented flag. The remaining 38 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

CM102106

2023

800

34069

0.02348176

OK085910

2013

30000

17170

1.747234

UF062903

2025

47000

14977

3.138145

MZ027209

2019

126000

25031

5.033758

UM037701

2010

600000

4826

124.3266

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 4.129 years. At full forecast savings and a 20% higher installed cost, it would give 3.716 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.