The median forecast payback for heating water during off-peak periods and store for later use was 3.9781 years across 8 qualifying US factory recommendations. The middle half ran from 3.282 to 4.0537 years. The median estimated annual saving was US$10,024. These figures describe proposals at the time of assessment.

The scope of the plant change

Read interval demand and production together. Identify whether the changed quantity is energy, peak demand or a fixed charge before assigning a tariff. Use the same billing boundary across the comparison and allow for coincident loads outside the project.

A recommendation you can reproduce

Recommendation AS014205 in US fiscal year 1995 pairs US$181,200 of implementation cost with US$45,069 in estimated annual net savings. Dividing the first figure by the second gives 4.021 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$36,919 and the median annual saving was US$10,024. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for heating water during off-peak periods and store for later use. Lower quartile 3.282, median 3.978 and upper quartile 4.054 years.
Estimated payback for heating water during off-peak periods and store for later use. Lower quartile 3.282, median 3.978 and upper quartile 4.054 years. Figure by Industry Applied.

What the records can support

The source lists 9 recommendations under assessment code 2.3111. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 8 comparable records, 2 carry the implemented flag and 5 the non-implemented flag. The remaining 1 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

0 of 8 comparable proposals had an estimated payback of one year or less. 8 carried a positive implementation cost. Inspect zero-cost and positive-cost proposals separately when comparing a change in operating practice with a capital project.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

CC001303

2023

8400

4697

1.788376

OR065005

2015

4404

1291

3.411309

AS014205

1995

181200

45069

4.020502

UF008305

1994

55700

13781

4.041797

AS004603

1992

172000

41247

4.17

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 5.361 years. At full forecast savings and a 20% higher installed cost, it would give 4.825 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

What a two-year screening rule would have selected

Among the 8 proposals with a positive implementation cost, 1 (12.5%) had a forecast simple payback of two years or less. The calculation excludes 0 zero-cost records. For a local project with a two-year screening period, divide the quoted installed cost by two to find the minimum annual net saving needed. Use local currency and include the recurring cost of making the change.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.