Across 62 qualifying US industrial recommendations, the median projected simple payback was 0.3783 years. The middle half ran from 0.1387 to 0.8393 years. Those figures describe the assessed proposals for establishing equipment maintenance schedule, in fiscal years 1982 to 2026.

The scope of the plant change

Follow one representative order through the affected operation and record elapsed time, productive time and rejected units separately. Compare like product mixes across shifts and check whether a local speed increase moves the bottleneck to the next station.

A recommendation you can reproduce

Recommendation UK121503 in US fiscal year 2013 pairs US$1,610 of implementation cost with US$4,021 in estimated annual net savings. Dividing the first figure by the second gives 0.4004 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$1,350 and the median annual saving was US$2,860. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for establishing equipment maintenance schedule. Lower quartile 0.1387, median 0.3783 and upper quartile 0.8393 years.
Estimated payback for establishing equipment maintenance schedule. Lower quartile 0.1387, median 0.3783 and upper quartile 0.8393 years. Figure by Industry Applied.

What the records can support

The source lists 89 recommendations under assessment code 2.6124. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 62 comparable records, 38 carry the implemented flag and 21 the non-implemented flag. The remaining 3 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 38 qualifying records had a median of 0.3103 years. For fiscal years 2000–2014, 16 qualifying records had a median of 0.3783 years. For fiscal years 2015–2026, 8 qualifying records had a median of 1.701 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

BS014901

2021

22.87

9819.46

0.002329049

KU013812

1984

120

884

0.1357466

WV038202

2008

38900

109212

0.356188

CO007010

1986

100

118

0.8474576

TT025807

2021

5000

1108

4.512635

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.5339 years. At full forecast savings and a 20% higher installed cost, it would give 0.4805 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.