Across 26 qualifying US industrial recommendations, the median projected simple payback was 0.5769 years. The middle half ran from 0.1426 to 1.8 years. Those figures describe the assessed proposals for eliminating practice of mixing waste streams, in fiscal years 1995 to 2022.

The scope of the plant change

Follow a measured quantity of material from receiving through saleable output to recovery or disposal. Account for moisture, rework and scrap sold separately. Capture both the unit price and the handling time so a reduced disposal bill is not counted twice.

A recommendation you can reproduce

Recommendation UF018207 in US fiscal year 1997 pairs US$2,400 of implementation cost with US$4,567 in estimated annual net savings. Dividing the first figure by the second gives 0.5255 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$3,503 and the median annual saving was US$9,547. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for eliminating practice of mixing waste streams. Lower quartile 0.1426, median 0.5769 and upper quartile 1.8 years.
Estimated payback for eliminating practice of mixing waste streams. Lower quartile 0.1426, median 0.5769 and upper quartile 1.8 years. Figure by Industry Applied.

What the records can support

The source lists 33 recommendations under assessment code 3.1291. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 26 comparable records, 8 carry the implemented flag and 17 the non-implemented flag. The remaining 1 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 17 qualifying records had a median of 0.2439 years. For fiscal years 2000–2014, 6 qualifying records had a median of 2.002 years. For fiscal years 2015–2026, 3 qualifying records had a median of 1.286 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

CO035101

1996

520

98120

0.005299633

HO020207

1999

350

2492

0.1404494

UF018207

1997

2400

4567

0.5255091

UF032507

2003

75000

38880

1.929012

LS102209

2022

16545

3599

4.59711

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.7007 years. At full forecast savings and a 20% higher installed cost, it would give 0.6306 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.