Across 227 qualifying US industrial recommendations, the median projected simple payback was 1.384 years. The middle half ran from 0.5847 to 2.831 years. Those figures describe the assessed proposals for electrifying hydraulic or pneumatic equipment, in fiscal years 1982 to 2026.

The scope of the plant change

Match stroke, required force, cycle time and duty factor. Include the original shared compressor or hydraulic power pack in the baseline. Show whether the source plant can reduce input once this particular end use is removed.

A recommendation you can reproduce

Recommendation WI049606 in US fiscal year 2005 pairs US$2,000 of implementation cost with US$1,445 in estimated annual net savings. Dividing the first figure by the second gives 1.384 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$4,781 and the median annual saving was US$4,017. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for electrifying hydraulic or pneumatic equipment. Lower quartile 0.5847, median 1.384 and upper quartile 2.831 years.
Estimated payback for electrifying hydraulic or pneumatic equipment. Lower quartile 0.5847, median 1.384 and upper quartile 2.831 years. Figure by Industry Applied.

What the records can support

The source lists 230 recommendations under assessment code 2.4324. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 227 comparable records, 62 carry the implemented flag and 143 the non-implemented flag. The remaining 22 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

MS046605

2026

712

42861

0.01661184

WM019407

2023

9000

15440

0.5829016

WI049606

2005

2000

1445

1.384083

UA025803

2022

7484

2610

2.867433

OR062103

2013

13505

423

31.92671

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.845 years. At full forecast savings and a 20% higher installed cost, it would give 1.661 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.