The median implementation estimate for electrifying fossil-fuel process equipment was US$36,000 across 269 qualifying US factory recommendations. The middle half of project-cost estimates ran from US$7,150 to US$141,050. These amounts are nominal US dollars from the assessment years.
The scope of the plant change
Compare equal delivered heat or mechanical duty. Use the site’s current electricity time bands, fuel tariff and electrical capacity in the local case. Include connection reinforcement and separately report any emissions estimate and its basis.
A recommendation you can reproduce
Recommendation AS051304 in US fiscal year 2022 pairs US$43,000 of implementation cost with US$15,767 in estimated annual net savings. Dividing the first figure by the second gives 2.727 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.
The median implementation cost was US$36,000 and the median annual saving was US$14,911. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

What the records can support
The source lists 284 recommendations under assessment code 2.1321. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.
Of the 269 comparable records, 53 carry the implemented flag and 168 the non-implemented flag. The remaining 48 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.
Worked data
Recommendation ID | US fiscal year | Implementation cost (USD) | Estimated annual net saving (USD) | Recalculated payback (years) |
|---|---|---|---|---|
OR050102 | 2006 | 1 | 72600 | 1.37741e-05 |
ME029201 | 2000 | 13000 | 13365 | 0.9726899 |
AS051304 | 2022 | 43000 | 15767 | 2.727215 |
UC230105 | 2023 | 3250 | 668.917 | 4.8586 |
LT836204 | 2022 | 29000 | 808.22 | 35.88132 |
Using the evidence in an Australian project
For the worked record, delivering only three quarters of its estimated annual saving would give 3.636 years. At full forecast savings and a 20% higher installed cost, it would give 3.273 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.
Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.
What a two-year screening rule would have selected
Among the 269 proposals with a positive implementation cost, 116 (43.123%) had a forecast simple payback of two years or less. The calculation excludes 0 zero-cost records. For a local project with a two-year screening period, divide the quoted installed cost by two to find the minimum annual net saving needed. Use local currency and include the recurring cost of making the change.
Sources and calculation files
The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.