Two cooling-tower water meters tell different parts of the story

Reconcile make-up and blowdown volumes, then use conductivity as an independent check before reporting water saved.

Industry Applied Editorial Published 2 min read

Industrial cooling tower and water connections. AI-generated editorial illustration.
AI-generated editorial illustration by Industry Applied · Industry Applied editorial artwork

A cooling tower receiving 100 kL of make-up and discharging 25 kL of measured blowdown over a stable week has a 75 kL remainder. Evaporation is usually a large part of that remainder. Drift, overflow, leaks and a change in basin inventory can also be present. Calling all 75 kL evaporation closes a spreadsheet while hiding the very losses the meter review was meant to find.

Read two ratios independently

Under a simplified steady dissolved-solids balance with negligible drift and other losses, make-up divided by blowdown gives an approximate concentration ratio. In this case it is 100/25 = 4. A conductivity reading of 1,260 µS/cm in circulating water and 350 µS/cm in make-up gives 3.6. These figures are close enough to justify checking timestamps and meter boundaries, but the difference cannot identify one fault on its own.

With 100 kL of incoming water, an additional measured 5 kL of other loss changes the residual from 75 to 70 kL.
Figure 1. With 100 kL of incoming water, an additional measured 5 kL of other loss changes the residual from 75 to 70 kL. Original figure by Industry Applied Editorial. Illustrative data.

Worked data

Weekly scenario

Measured outflows besides evaporation

Residual (kL)

Blowdown only

25 kL

75

Another loss metered

25 + 5 kL

70

Download the figures in this worked example (CSV)

What to put in the maintenance record

Record meter start and end readings over the same week. Note basin fill or drain events and any make-up shared with another asset. Check whether the conductivity values represent the same operating period, with comparable temperature compensation. If the residual changes when a meter boundary changes, revise the balance before attributing savings to a maintenance intervention.

The US Department of Energy cooling-tower guidance explains cycles of concentration and the relationship between evaporation, make-up and blowdown. A water balance supports investigation. Water treatment, operating limits and public-health obligations belong to the site’s approved management programme. A difference between two ratios is a reason to collect better evidence, not an instruction to alter a controller.

Sources

US Department of Energy · Cooling tower water efficiency

Cover illustration by Industry Applied, generated with AI. Industrial cooling tower and water connections.