Across 6,078 qualifying US industrial recommendations, the median projected simple payback was 0.6256 years. The middle half ran from 0.2779 to 1.268 years. Those figures describe the assessed proposals for cooler compressor air intakes, in fiscal years 1981 to 2026.

The scope of the plant change

Measure the temperature at the existing intake across shifts and at the proposed intake over the same interval. Include inlet filtration pressure loss and duct resistance in the comparison. Airflow restrictions can change the economics of a cooler intake.

A recommendation you can reproduce

Recommendation NL005806 in US fiscal year 2021 pairs US$728 of implementation cost with US$1,164 in estimated annual net savings. Dividing the first figure by the second gives 0.6254 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$540 and the median annual saving was US$952. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for cooler compressor air intakes. Lower quartile 0.2779, median 0.6256 and upper quartile 1.268 years.
Estimated payback for cooler compressor air intakes. Lower quartile 0.2779, median 0.6256 and upper quartile 1.268 years. Figure by Industry Applied.

What the records can support

The source lists 6,167 recommendations under assessment code 2.4221. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 6,078 comparable records, 2,636 carry the implemented flag and 3,200 the non-implemented flag. The remaining 242 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

MU005802

2024

1

40066

2.495882e-05

ND000507

1991

100

360

0.2777778

NL005806

2021

728

1164

0.6254296

UD084604

2012

2000

1577

1.268231

MI009203

2004

38956

405

96.18765

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.8339 years. At full forecast savings and a 20% higher installed cost, it would give 0.7505 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.