Across 95 qualifying US industrial recommendations, the median projected simple payback was 1.926 years. The middle half ran from 0.8563 to 3.468 years. Those figures describe the assessed proposals for converting combustion equipment to burn natural gas, in fiscal years 1981 to 2025.

The scope of the plant change

Map the heated product, the hot exhaust and the periods when the process keeps equipment warm between batches. Express fuel use per accepted unit alongside total fuel. A change in product mix or loading can move those measures in opposite directions.

A recommendation you can reproduce

Recommendation GT064208 in US fiscal year 1998 pairs US$27,000 of implementation cost with US$14,022 in estimated annual net savings. Dividing the first figure by the second gives 1.926 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$14,000 and the median annual saving was US$7,398. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for converting combustion equipment to burn natural gas. Lower quartile 0.8563, median 1.926 and upper quartile 3.468 years.
Estimated payback for converting combustion equipment to burn natural gas. Lower quartile 0.8563, median 1.926 and upper quartile 3.468 years. Figure by Industry Applied.

What the records can support

The source lists 105 recommendations under assessment code 2.1332. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 95 comparable records, 37 carry the implemented flag and 57 the non-implemented flag. The remaining 1 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 55 qualifying records had a median of 1.926 years. For fiscal years 2000–2014, 21 qualifying records had a median of 1.399 years. For fiscal years 2015–2026, 19 qualifying records had a median of 2.584 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

OR024207

1995

1000

22000

0.04545455

GT047007

1992

3940

4526

0.8705259

GT064208

1998

27000

14022

1.925546

UD001802

1981

32000

9469

3.379449

UD042904

1994

50000

3500

14.28571

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 2.567 years. At full forecast savings and a 20% higher installed cost, it would give 2.311 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.