Across 9 qualifying US industrial recommendations, the median projected simple payback was 2.32 years. The middle half ran from 1.3 to 3.571 years. Those figures describe the assessed proposals for considering power loss as well as initial loads and load growth in down-sizing transformers, in fiscal years 1990 to 2025.

The scope of the plant change

Read interval demand and production together. Identify whether the changed quantity is energy, peak demand or a fixed charge before assigning a tariff. Use the same billing boundary across the comparison and allow for coincident loads outside the project.

A recommendation you can reproduce

Recommendation LE043707 in US fiscal year 2017 pairs US$200,000 of implementation cost with US$86,210 in estimated annual net savings. Dividing the first figure by the second gives 2.32 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$8,705 and the median annual saving was US$5,367. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for considering power loss as well as initial loads and load growth in down-sizing transformers. Lower quartile 1.3, median 2.32 and upper quartile 3.571 years.
Estimated payback for considering power loss as well as initial loads and load growth in down-sizing transformers. Lower quartile 1.3, median 2.32 and upper quartile 3.571 years. Figure by Industry Applied.

What the records can support

The source lists 10 recommendations under assessment code 2.3513. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 9 comparable records, 3 carry the implemented flag and 5 the non-implemented flag. The remaining 1 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

2 of 9 comparable proposals had an estimated payback of one year or less. 9 carried a positive implementation cost. Inspect zero-cost and positive-cost proposals separately when comparing a change in operating practice with a capital project.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

CO074406

2022

4219

60192

0.07009237

CO041903

1998

2820

2170

1.299539

LE043707

2017

200000

86210

2.319916

AS036007

2003

8705

2438

3.57055

LE044411

2017

1905000

233480.3

8.159147

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 3.093 years. At full forecast savings and a 20% higher installed cost, it would give 2.784 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.