Why three machine peaks do not add up to the factory’s billed demand
Align three half-hour records to see how a 150 kW sum of machine maxima becomes a 110 kW peak at the main meter.
The largest reading on each machine is a poor starting point for a demand-charge dispute. The supply meter sees the machines that ran together. If three machines reach their individual maxima at different times, adding those maxima creates a load the site may never have drawn.
Rebuild the interval that actually set the peak
Suppose a factory has three loads, all inside the same meter boundary. From 09:00 to 09:30 their average demands are 60, 20 and 20 kW. During the next half-hour they are 20, 50 and 40 kW. In the third interval they are 10, 30 and 40 kW. The individual maxima add to 150 kW. The highest coincident total is 110 kW in the second interval. Crucially, the machine drawing 60 kW did not set the time of the site peak.

Worked data
Half-hour beginning | Machine readings (kW) | Combined demand (kW) |
09:00 | 60 + 20 + 20 | 100 |
09:30 | 20 + 50 + 40 | 110 |
10:00 | 10 + 30 + 40 | 80 |
Download the figures in this worked example (CSV)
What would shifting a load change?
Moving an average of 15 kW out of the second interval would cut that interval to 95 kW. If the whole 15 kW lands in the third interval, that interval rises to 95 kW. The first interval then sets the new maximum at 100 kW. The effective peak reduction is 10 kW. This is why shifting the largest available machine can be a smaller opportunity than the machine rating suggests.
Compare totals with the parent meter for the same meter time zone and interval convention. A residual can include lighting, HVAC or an unmetered circuit. Some contracts use kVA, a different integration period, season or time window. Read the Australian Government’s energy-contract guidance alongside the facility’s own tariff before converting a kW result into money.
Meter agreement comes before tariff modelling
If the site meter reports 117 kW in the second interval while the three submeters sum to 110 kW, there is a 7 kW residual. Do not proportion it across the three machines simply to make the chart balance. Check whether the site meter also measures plant air, office ventilation or a small process heater. A stable residual across several operating states suggests a different investigation from a residual that appears only when one machine starts.
Export data with both the interval start and its duration. A spreadsheet labelled 09:30 can mean the block ending at 09:30 or the block beginning then. Comparing those two conventions can manufacture an apparent timing opportunity. In a demand calculation, the difference between half-hour energy and half-hour average power is also material: 55 kWh used uniformly or unevenly within one half-hour gives 110 kW average for that block.
A useful commissioning test is to reproduce two values from the bill, the demand and the interval in which it occurred. Matching the number in a different interval can be coincidence. Where the tariff takes a distribution maximum, seasonal window or power-factor adjustment, reproduce that rule from the contract before comparing a proposed production timetable.
Sources
Australian Government · Review your energy contract
Cover illustration by Industry Applied, generated with AI. Factory machines supplied by the same site electricity meter.
Related reading
The largest reading on each machine is a poor starting point for a demand-charge dispute. The supply meter sees the machines that ran together. If three machines reach their individual maxima at different times, adding those maxima creates a load the site may never have drawn.
Rebuild the interval that actually set the peak
Suppose a factory has three loads, all inside the same meter boundary. From 09:00 to 09:30 their average demands are 60, 20 and 20 kW. During the next half-hour they are 20, 50 and 40 kW. In the third interval they are 10, 30 and 40 kW. The individual maxima add to 150 kW. The highest coincident total is 110 kW in the second interval. Crucially, the machine drawing 60 kW did not set the time of the site peak.

Worked data
Half-hour beginning | Machine readings (kW) | Combined demand (kW) |
09:00 | 60 + 20 + 20 | 100 |
09:30 | 20 + 50 + 40 | 110 |
10:00 | 10 + 30 + 40 | 80 |
Download the figures in this worked example (CSV)
What would shifting a load change?
Moving an average of 15 kW out of the second interval would cut that interval to 95 kW. If the whole 15 kW lands in the third interval, that interval rises to 95 kW. The first interval then sets the new maximum at 100 kW. The effective peak reduction is 10 kW. This is why shifting the largest available machine can be a smaller opportunity than the machine rating suggests.
Compare totals with the parent meter for the same meter time zone and interval convention. A residual can include lighting, HVAC or an unmetered circuit. Some contracts use kVA, a different integration period, season or time window. Read the Australian Government’s energy-contract guidance alongside the facility’s own tariff before converting a kW result into money.
Meter agreement comes before tariff modelling
If the site meter reports 117 kW in the second interval while the three submeters sum to 110 kW, there is a 7 kW residual. Do not proportion it across the three machines simply to make the chart balance. Check whether the site meter also measures plant air, office ventilation or a small process heater. A stable residual across several operating states suggests a different investigation from a residual that appears only when one machine starts.
Export data with both the interval start and its duration. A spreadsheet labelled 09:30 can mean the block ending at 09:30 or the block beginning then. Comparing those two conventions can manufacture an apparent timing opportunity. In a demand calculation, the difference between half-hour energy and half-hour average power is also material: 55 kWh used uniformly or unevenly within one half-hour gives 110 kW average for that block.
A useful commissioning test is to reproduce two values from the bill, the demand and the interval in which it occurred. Matching the number in a different interval can be coincidence. Where the tariff takes a distribution maximum, seasonal window or power-factor adjustment, reproduce that rule from the contract before comparing a proposed production timetable.