Manufacturing · Industrial IoT
Which half-hour set the factory’s demand peak?
Convert interval electricity into average power, then use the site’s tariff window to identify the peak worth investigating.

A kiln, a compressor and a wash-water heater all start near the morning change of shift. Their individual nameplates say little about what the site meter actually recorded together. An interval export lets an energy manager identify the period worth investigating before moving any production.
Convert energy into average power
Obtain the meter file and its interval convention. A row marked 09:00 may refer to the period beginning or ending then. Align it to the production log. Divide interval kWh by interval hours to obtain average kW. Read the actual contract for whether demand is based on kW or kVA, the eligible time window and the billing period.
In a worked example, three consecutive half-hours use 42, 66 and 48 kWh. Their average demands are 84, 132 and 96 kW. The middle interval is the highest of those three. A brief instantaneous spike within another interval may still be larger than 132 kW.

What to check on site
Confirm that the meter file covers every interval in the billing period.
Flag overlapping starts and check them against the highest eligible interval.
After rescheduling one load, check whether another interval becomes the new peak.
Apply this to the billing arrangements on the Australian or New Zealand site concerned. A reduction in peak kW can coexist with exactly the same daily kWh.
Sources and photograph
Australian Government — electricity pricing plans and tariffs
A kiln, a compressor and a wash-water heater all start near the morning change of shift. Their individual nameplates say little about what the site meter actually recorded together. An interval export lets an energy manager identify the period worth investigating before moving any production.
Convert energy into average power
Obtain the meter file and its interval convention. A row marked 09:00 may refer to the period beginning or ending then. Align it to the production log. Divide interval kWh by interval hours to obtain average kW. Read the actual contract for whether demand is based on kW or kVA, the eligible time window and the billing period.
In a worked example, three consecutive half-hours use 42, 66 and 48 kWh. Their average demands are 84, 132 and 96 kW. The middle interval is the highest of those three. A brief instantaneous spike within another interval may still be larger than 132 kW.

What to check on site
Confirm that the meter file covers every interval in the billing period.
Flag overlapping starts and check them against the highest eligible interval.
After rescheduling one load, check whether another interval becomes the new peak.
Apply this to the billing arrangements on the Australian or New Zealand site concerned. A reduction in peak kW can coexist with exactly the same daily kWh.
Sources and photograph
Australian Government — electricity pricing plans and tariffs