The middle half of the estimated payback periods ran from 0.14402 to 2.4982 years for closing outdoor air dampers during warm-up or cool-down periods, a spread of 2.3542 years. The median among 12 qualifying US proposals was 0.86297 years. Each proposal has equal weight.

The scope of the plant change

Connect equipment input power to the service delivered. Log entering and leaving conditions plus run status and schedule. Compare matching load or weather bands, since a cooler week can mimic an improvement even when the equipment behaves identically.

A recommendation you can reproduce

Recommendation KU005105 in US fiscal year 1982 pairs US$40 of implementation cost with US$178 in estimated annual net savings. Dividing the first figure by the second gives 0.2247 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$2,825 and the median annual saving was US$1,848. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for closing outdoor air dampers during warm-up or cool-down periods. Lower quartile 0.144, median 0.863 and upper quartile 2.498 years.
Estimated payback for closing outdoor air dampers during warm-up or cool-down periods. Lower quartile 0.144, median 0.863 and upper quartile 2.498 years. Figure by Industry Applied.

What the records can support

The source lists 15 recommendations under assessment code 2.7225. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 12 comparable records, 4 carry the implemented flag and 7 the non-implemented flag. The remaining 1 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 2000–2014, 6 qualifying records had a median of 0.8493 years. For fiscal years 2015–2026, 4 qualifying records had a median of 1.138 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

AS033406

2002

60

3596

0.01668521

TT031605

2024

3200

18330

0.1745772

GT068404

2000

2450

1632

1.501225

WV010806

1997

705

307

2.296417

UF041209

2008

10480

1822

5.751921

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.2996 years. At full forecast savings and a 20% higher installed cost, it would give 0.2697 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

What a two-year screening rule would have selected

Among the 12 proposals with a positive implementation cost, 7 (58.333%) had a forecast simple payback of two years or less. The calculation excludes 0 zero-cost records. For a local project with a two-year screening period, divide the quoted installed cost by two to find the minimum annual net saving needed. Use local currency and include the recurring cost of making the change.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.