Across 150 qualifying US industrial recommendations, the median projected simple payback was 0.1218 years. The middle half ran from 0.0327 to 0.7118 years. Those figures describe the assessed proposals for chilled-water temperature reset, in fiscal years 1994 to 2026.

The scope of the plant change

Log the warmest permissible supply temperature under the most demanding process condition. Compare chiller input at comparable cooling loads and check terminal flow and pump demand. Include humidity control where the same loop serves air handling.

A recommendation you can reproduce

Recommendation WV028813 in US fiscal year 2004 pairs US$25 of implementation cost with US$203 in estimated annual net savings. Dividing the first figure by the second gives 0.1232 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$350 and the median annual saving was US$3,652. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for chilled-water temperature reset. Lower quartile 0.0327, median 0.1218 and upper quartile 0.7118 years.
Estimated payback for chilled-water temperature reset. Lower quartile 0.0327, median 0.1218 and upper quartile 0.7118 years. Figure by Industry Applied.

What the records can support

The source lists 221 recommendations under assessment code 2.2625. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 150 comparable records, 67 carry the implemented flag and 65 the non-implemented flag. The remaining 18 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

BD033207

2007

2

4182

0.0004782401

WV044615

2012

70

2151

0.032543

WV009502

1996

550

4565

0.1204819

AM093301

2025

1000

1394

0.7173601

UU027102

2025

1175

132.75

8.851224

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 0.1642 years. At full forecast savings and a 20% higher installed cost, it would give 0.1478 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Reconcile the proposed baseline and the acceptance test in the same spreadsheet. Record the meter boundary, operating hours and product output in both periods. Keep any downtime allowance separate from recurring savings when comparing two options.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.